When using electric fusion tees, please note the following:
1. Select the appropriate material and specifications, and choose the appropriate electric fusion tee based on the material being transported;
2. Before welding, clean the joints between the pipe and the electric fusion tee and ensure they are dry;
3. Use a dedicated electric fusion rectangular head or electric fusion pipe segments for welding, and follow the welding procedures;
4. After welding, check the joints for tightness and conduct a water pressure test to ensure they can withstand the system's design pressure.
