1. Prepare tools and materials: a steel ruler, wrench, electric fusion tee, pipe, and other materials.
2. Cut the pipe to the desired length, ensuring the pipe ends are flat.
3. Clean the pipe and electric fusion tee joints and inspect for cracks or damage.
4. Install the appropriate interface materials for each connection method and perform the docking.
5. Inspect all connections to ensure there are no leaks or defects.
