Fusion Tee Operation Steps

Aug 11, 2025

Leave a message

1. Select the appropriate fusion tee material and specifications, and determine the pipe length based on the actual application and requirements.

2. Cut the pipe, chamfer, and polish it to ensure optimal weld quality.

3. Connect the fusion tee to the pipe, paying attention to its position and orientation, and secure it with a flange or fitting.

4. Perform the fusion welding. Clean the joint before welding to prevent any damage.

5. Perform a water pressure test to ensure the seal and quality of the fusion tee.

Send Inquiry
Contact usif have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!